[1]
Adistyas Nastiti, O. and Sukmono, T. 2025. Implementation of Nawaz, Enscore, and Ham (NEH) for Minimize Makespan in Job Shop Scheduling . International Journal on Orange Technologies. 7, 2 (May 2025), 86–98. DOI:https://doi.org/10.31149/ijot.v7i2.5438.